---
title: "Progress"
updated: "04-11-2026"
---

# Progress

<p class="says">We are at step 3 of 7, the mockups. Step 2, the specifications, was signed off on 26-10-2026; its copy is in History.</p>

## How a step moves

The work is cut into seven steps, each producing something you can read or click. Every step gets the same four marks, always in this order:

| Mark | What it means | Who |
|---|---|---|
| **Written** | The step's documents exist | Claude, from the sources and earlier decisions |
| **Agreed in principle** | melux has read each document and agrees with its direction; open questions are answered | melux |
| **Checked by reviewers** | Two agents, Claude and Codex, each look for what is wrong or missing, on their own; every finding is numbered and answered in the step's reviews, in the columns set out in [history](history.html#reviews) (D50) | the agents; melux decides what the findings change |
| **Signed off** | The step is final and dated; its copy is kept in [history](history.html) | melux, after colleagues' comments |

Nothing is drawn or built before a step is signed off.

Every question asked along the way, answered or not, is kept in the [questions and answers](questions.html), by round (D50). An open question is written with who asked it and when, its options, the one recommended and why, and what happens if no one answers.

## How a module page is written

Step 2 has one page per module, each in the same template (D49), at most 450 words:

| Part | What it holds |
|---|---|
| **Definition and examples** | What the module is in two or three sentences, with real examples from Burundi or Rwanda |
| **Functions** | Numbered and grouped; the [continuity table](continuity.html) says which function of v7 or of the prototype each one takes over |
| **Rules** | What always holds, written as a rule a tester can check |
| **Decisions needed** | Open questions, in the form above, numbered in the ledger |
| **Related documents** | What the page was written from, at which commit, and what was not seen |

A function of v7 or of the prototype found on the way is added to the continuity table first, with a new F-number, then to its module.

## The seven steps

<!-- block:progress -->

## Timeline

| Date | What happened |
|---|---|
| 28-09-2026 | The work asked for: turn the Burundi prototype into a calculator any portal can embed |
| 29-09-2026 | Step 1 written, agreed in principle, checked by reviewers |
| 30-09-2026 | Step 1 signed off. Step 2's eleven modules written, agreed in principle and checked; the contract and the states of the page added |
| 30-09 to 01-10-2026 | First colleague comments: Mehdi Benmoumen, Frank Grozel, Julien Bornon |
| 15-10-2026 | The way of working brought back from eRegulations-Next, which had taken it from here: the breadcrumb, larger text, the questions ledger, the continuity table, French pages (D49 to D51) |
| 15-10-2026 | The specifications brought level with v7's tariff page up to release 7.6.49; three new questions, ?37 to ?39 |
| 26-10-2026 | KRA's tax calculator read; two questions, ?40 and ?41; ?37 to ?41 answered (D52 to D56) |
| 26-10-2026 | Step 2 signed off; its fourteen pages kept as they were in History |
| 26-10-2026 | Step 3's first pass written: v7's tariff page reproduced, with five differences |
| 29-10-2026 | The Kenya Duty Estimator read; it becomes the second pass's reference and D56's case (D57) |
| 04-11-2026 | Step 3's first pass agreed in principle |
| 04-11-2026 | Step 3's second pass written and checked in part: the design, the clickable mockups, 82 rows replayed at 1 280 and 375 pixels, 28 of them walked by hand at 1 280, the print dialog not seen |
| Next | melux's agreement on the second pass |

## Waiting and stuck

<div class="cards">
<div class="card hot">

Waiting on melux

**Agreeing the second pass** of the mockups, written on 04-11-2026 and checked in part (28 of its 82 rows by hand at 1 280 pixels, all replayed at both widths, the print dialog not seen; the first pass was agreed in principle on 04-11-2026). Administration then gets a third pass before step 3 is signed off (D59).

</div>
<div class="card stuck">

Stuck

**OBR's test service, silent since 04-09-2026.** Waiting on OBR's IT department.

Blocks only new cases from the test host; pilot 1 uses production instead (D24).

</div>
</div>
